| STEP |
IMAGE |
DESCRIPTION |
| 1 |
 |
#1 Center
point rails with masking tape. Place switch on layout and mark position
with marking pen so it can be returned to its same position. Using a pin
vise and small drill, drill down into top of layout thru tie bar as
shown. This will create a guide hole to drill the 1/4" hole completely
through layout. |
| 2 |
 |
#2 Remove
switch and drill 1/8” starter hole, then 1/4” finish hole, or drill 3/8”
finish hole if layout is thicker than 1 1/2”. |
| 3 |
 |
#3 Chamfer
both top and bottom of hole. |
| 4 |
 |
#4 This is the
drill template shown in our instruction sheet. It is a must that you use
this template and make a drill fixture. Using the drill fixture will
exactly locate the four mounting holes in relation to the 1/4”. This
means that the Blue Point is centered every time you mount it so you can
achieve equal tension on the switch point to stock rail tension. From
our instruction you can make your own drill fixture or buy one from
us. (Buy Drill Fixture) |
| 5 |
 |
#5 Place the
drill fixture in 1/4” hole. Make sure centerline of fixture is aligned
with centerline of track. Now drill the four holes completely through
the layout. |
| 6 |
 |
#6 This
picture shows drilled 1/4” hole, mounting holes and switch relocation
marks |
| 7 |
 |
#7 Shows
chamfered 1/4" hole and marked mounting holes. By marking mounting holes
with black marking pen makes them easier to find when attaching Blue
Point under layout. A minimum of two screws mounted diagonally will hold
the Blue Point fine. |
| 7a |
 |
#7a Complete
“Flex Link Starter Kit” (#40022) for mounting and operating one Blue
Point. |
| 8 |
 |
#8 Pre
assemble Blue Point, wire, clevis and bracket with black clamp. |
| 9 |
 |
#9 Picture
shows Flex Link clamp and screw. Flex Link clamp has two hole sizes, one
small and one large. Screw should pass through large hole and screw into
small hole. When Blue Point, bracket and clamp are mounted under layout
screw head should face toward floor so it can be adjusted easily. |
| 10 |
 |
#10 Complete
Blue Point and Flex Link parts assembled ready to mount to layout. We
used masking tape to hold bracket to Blue Point for easier installation.
We have used two screws mounted diagonally across from each other with
good success. Feed Blue Point control wire up through hole in layout and
into throw bar hole in switch points. Then we first install one screw
and snug it up, but not completely tight. This holds Blue Point in place
so second screw can be installed easily. Trim masking tape off of each
side of Blue Point so it will move when final adjustments are made. |
| 11 |
 |
#11 Complete
Blue Point assembly mounting with red outer tube sticking through 11/64”
hole that has been drilled through back-up block. Remove yellow tube
before going to next step. |
| 11A |
 |
|
| 11B |
 |
|
| 12 |
 |
#12 Mark red
tube at face of back-up block |
| 13 |
 |
#13 Push red
tube out and cut at marked line. Be careful not to split tubing at end
when trimming off. |
| 14 |
 |
#14 Push red
tube back into back-up block until it is flush. |
| 15 |
 |
#15 Install
threaded rod into yellow tube about a 1/4” deep. Grab stud with needle
nose pliers just above the 1/4” area so balance of threads will not be
damaged. This will prevent problems when threading stud into clevis. |
| 16 |
 |
#16 Push
yellow tube into red tube and screw into clevis on Blue Point. Operate
the Blue Point by pushing and pulling yellow tube. Make sure action
feels smooth, with no binding. Now push yellow tube in and mark it with
black pen. |
| 17 |
 |
#17 Unscrew
yellow tube from clevis and pull out slightly, enough to trim tubing off
at mark. Now attach control knob with 2-56 screw and washer to yellow
tube. Make sure it is tight. Then screw threaded stud back into clevis.
This step might be made easier by using the Philip head screw in the
control knob to screw the stud back into clevis. When knob is pushed in
there should be a slight space between back of knob and the face of the
back-up block. |
| 19 |
 |
#19 Picture
shows recessed or flush mounted control knob mounting. |
| 19A |
 |
#19a After
Blue Point is completely mounted grab the control wire with your fingers
and gently pull up on it while you are cutting it off. Try to keep your
cutters as flush to the rails as you can as shown in the picture, this
will leave very little sticking up so it will not interfere with track
cleaning. |